Project Brief

To construct an additional lane at the northbound diverge for the M3 and associated works which included earthworks, drainage, safety narrier installation and surfacing.

CPM Solution

CPM Hydrobrakes had to be retrofitted on to previously laid drainage usine band seals to connect into the chamber. The Hydrobrakes includes a series of 8 flow control chambers, 1 x 3000mm, 1 x 2400mm, 4 x 2100mm and 2 x 1500mm.

Client Comments

Sharon Sutton, BAM Nuttall Section Engineer commented that fitting the Hydro-brakes after the drainage had been laid shows that the chambers do not have to be constructed on line and as such the lead time for site means that the works can continue and the wait for delivery does not become a holding point for the contractor.


Other Off-site Solutions Case Studies


Sewage Pumping Station, Burton on the Wolds

Sewage Pumping Station, Burton on the Wolds

“CPM supplied 1869 blocks despite a tight programme and poor weather conditions on schedule”

Kevin Seymour, CPM Group

Helliers Lane, Cheddar, Somerset

Helliers Lane, Cheddar, Somerset

“The integrity of the design gave the team involved the security that the chambers would not leak”

Symon Wheeler - Brandwell Construction

The Great Barford Bypass

The Great Barford Bypass

“Ordering precast chambers with Hydro-Brakes already fitted wins on quality and was a good reason to use CPM”

Mike Brookes Edmund Nuttall






Back to top

Concrete for Life