Retaining Walls Case Study / The Glass Works

Image ofThe Glass Works

Project

The Glass Works

Client

Friel Homes

Contractor

Friel Construction

Project Brief

Retaining wall 50mt long and up to 3.5mt high.

The site was a former glass works factory dating back to the 1500's in the centre of the historic town of Tutbury in Burton on Trent making this a very strategic site for planning and a focus for the existing villagers. Its topography was considerably challenging for design and already had significant retaining walls up to 7m tall. Therefore, the proposed design for the site had to take into account the restrictions placed upon it for a feasibly habitable solution for the end user whilst giving both good aesthetic value. As Friels were both client and contractor the design also had to resolve all the construction issues of building on a tight, sloped site and its access restrictions whilst maintaining all the very serious requirements of the Health and Safety guidelines.

CPM Solution

After investigating the possibilities of insitu concrete walls, timber walls, precast panels and gabions the decision was made to specify the Redi-Rock system.

Client Comments

"This was primarily due to the fact it fitted all our criteria bar one. The system gave us a quick easy build solution which looked good and reduced the Health and Safety issues, the missing criteria was the cost.

"The initial payment for the materials was higher than our budget, but due to its exceptional speed of erecting our build program was reduced from a programmed 5 weeks to a staggering 8 days, which included training the operatives which would be reduced further on future walls, giving an overall saving on the budget.

"The result was a 50m long 2.5m high wall in just over a week, with comments from both operatives and local residents which were all positive.

"Now we are currently progressing our next site using this system."

Andrew Bache, Development Manager, Friel Homes.


Other Retaining Walls Case Studies


River Teifi, Tregaron, Wales

River Teifi, Tregaron, Wales

“Redi-Rock is ideal for this location in view of the speed with which flood walls can be constructed”

Tim Hopkins, Environment Agency

Citadel Junction

Citadel Junction

“Redi-Rock was chosen due to the speed of installation as the modular blocks are dry stacked like giant Lego blocks”

Paul Cartwright, CPM Group

Henley Grange, Halesowen

Henley Grange, Halesowen

“We found the system to be easily designed and planned, quick and easy to install and aesthetically pleasing”

Neil Stobbart, Bryant Homes