- Stormwater Management
- Stormwater Attenuation
- Stormwater Dry Flow Channel Pipes
- Stormwater control
- Stormwater treatment
- Rainwater Management
- Domestic Rainwater Harvesting system
- Commercial Rainwater Harvesting systems
- Domestic/Commercial Grey-water recycling system
- Wastewater Management
- Sewer Cleansing
- Combined Sewer Overflows (CSO's)
- Pumping chambers
- Septic tanks
- Waste Management
- Flood protection
- Ground heat exchangers (Earth tubes)
- Stormwater Management
M3 Junctions 3 and 4
Project
M3 Junctions 3 and 4.
Contractor / client
BAM Nuttall
Brief
To construct an additional lane at the northbound diverge for the M3 and associated works which included earthworks, drainage, safety narrier installation and surfacing.
CPM solution
CPM Hydrobrakes had to be retrofitted on to previously laid drainage usine band seals to connect into the chamber. The Hydrobrakes includes a series of 8 flow control chambers, 1 x 3000mm, 1 x 2400mm, 4 x 2100mm and 2 x 1500mm.
Client comments
Sharon Sutton, BAM Nuttall Section Engineer commented that fitting the Hydro-brakes after the drainage had been laid shows that the chambers do not have to be constructed on line and as such the lead time for site means that the works can continue and the wait for delivery does not become a holding point for the contractor.