
- Stormwater Management
- Stormwater Attenuation
- Stormwater Dry Flow Channel Pipes
- Stormwater control
- Stormwater treatment
- Rainwater Management
- Domestic Rainwater Harvesting system
- Commercial Rainwater Harvesting systems
- Domestic/Commercial Grey-water recycling system
- Wastewater Management
- Sewer Cleansing
- Combined Sewer Overflows (CSO's)
- Pumping chambers
- Septic tanks
- Waste Management
- Flood protection
- Ground heat exchangers (Earth tubes)
- Stormwater Management
Hydro-Brake® Penstock Chambers
A combined Hydro-Brake®/penstock chamber which have been designed specifically for the Yorkshire Water area. Both products are pre-mounted onto the Headwall side by side in either a DN 1200mm, 1500mm, 1800mm & 2100mm one-piece chambers or DN 2m, 2.1m, 2.4m, 2.55m, 2.7 or 3m sectional chamber system. The CPM one-piece chamber is fabricated using a base unit complying BS EN 1917:2002. The Off-Site Solution chamber has been designed to enable the contractor to install the flow control chamber in a fraction of time it takes using conventional methods










