CPM

NULL

Spillway Outfalls and Headwalls

CPM Environmental have developed an Off-Site Solutions Spillway Headwall system so why spend days constructing an in-situ headwall on site when pre-cast options are available now & can be installed in hours, not days!

spillwaysspillways

Benefits

  • One-piece reinforced concrete
  • CPM Spillway Headwalls can accommodate pipe-work up to & including 1600mm ID - 2000mm OD
  • Can be pre-fitted closed coupled & cranked gratings
  • Four sizes available each with various height options
  • Bespoke pre-cast options available
  • Can be pre-fitted various accessories including: Hydro-Brakes®, Penstocks, Non-return Flap Valves
  • Can be installed at a fraction of the cost of in-situ unit.
  • Greatly reduced installation time on site
  • No or minimal on-site fabrications

spillwaysspillways

image_001
image_002
image_003