CPM Off-site Solutions

The construction industry's demand for fast, efficient, modular systems has in line with CPM's continuing progress of innovation and product development lead to CPM being able to offer a diverse range of offsite solutions that are designed, engineered and manufactured off-site under factory conditions.

Whether it is a precast chamber with a hydro brake pre-fitted or a bespoke manhole section which has been specially designed, that speed up installation whilst offering a safe working environment or a dry-weather flow pipe that is correct to the millimetre and reduces the site time programme and disruption to local residents the off-site solutions team are able to offer practical solutions based on sound design and engineering knowledge that results in minimal site installation costs and increased health and safely benefits whilst being cost effective.

CPM's technical team, made up of qualified civil engineers are on hand to give advice and CPM offers a complete design service with AutoCAD drawings and calculations that is fully supported by professional indemnity insurance for your peace of mind.



What makes CPM the Industry choice for off-site solutions products?



  • / In house structurally designed
  • / Guaranteed quality
  • / Bespoke service
  • / Supplied in house drawings


Need something bespoke?
Why not contact our Sales Department

Tel: 01179 812791
Fax: 01179 814511
Email: sales@cpm-group.com








CPM Off-site Solutions / Projects



Sewage Pumping Station, Burton on the Wolds

Sewage Pumping Station, Burton on the Wolds

“CPM supplied 1869 blocks despite a tight programme and poor weather conditions on schedule”

Kevin Seymour, CPM Group

M3 Junctions 3 and 4

M3 Junctions 3 and 4

“Chambers do not have to be constructed on line and as such the lead time for site [is less]”

Sharon Sutton, BAM Nuttall

The Great Barford Bypass

The Great Barford Bypass

“Ordering precast chambers with Hydro-Brakes already fitted wins on quality and was a good reason to use CPM”

Mike Brookes Edmund Nuttall

Helliers Lane, Cheddar, Somerset

Helliers Lane, Cheddar, Somerset

“The integrity of the design gave the team involved the security that the chambers would not leak”

Symon Wheeler - Brandwell Construction


Need something bespoke?
Why not contact our Sales Department

Tel: 01179 812791
Fax: 01179 814511
Email: sales@cpm-group.com





Back to top

Concrete for life