Product:
Retaining Walls
Project:
River Teifi
Contractor:
Morrison Construction
Client:
Environment Agency

Project Brief

To strengthen the existing walls that bordered the river to provide an increase level of flood protection.

CPM Solution

The simple Redi-Rock™ big block solution met the needs of the local residents and planners as it blended in with the natural environment with minimal disruption as it is quick to install.

Client Comments

Project Manager, Tim Hopkins of the Environment Agency said “Redi-Rock™ is an ideal solution for this location in view particularly of the speed with which flood walls can be constructed”

Let us help find what you need

Select from our list below to explore our solutions in detail

I know what product I need

Select from our list below to explore our products in detail

Resources