CPM Drainage

  • Concrete Pipes
  • Sealed manhole systems
  • Manhole bases
  • Manholes
  • Special cover slabs
  • Caissons
  • Gully pots

CPM is a market leader in the supply,
manufacture and design of concrete drainage products.

Our UK wide distribution network is available to allow
you to access our wide range of drainage products wherever you are.

Drainage

CPM Retaining Walls

  • Redi-Rock™ Modular retaining walls
  • Redi-Rock™ Modular free standing walls
  • Flood protection
  • Landscaping
  • Reinforced panels
  • L sections
  • Hostile Vehicle Mitigation

The Redi-Rock™ retaining wall system is an ingenious, space saving
solution for the retention of earth for a wide range of retaining,
force protection, landscaping and flood protection applications.
This 'big block system' has the appearance of stone and is versatile
enough to achieve height without compromising strength.

Retaining Walls

CPM Specialist Precast

  • Bespoke Precast Products
  • Special cover slabs
  • Spillway blocks / Dam tiles
  • Beams
  • Stairs / Terraces
  • Troughs and channels
  • Reinforced panels

Our Specialist Precast division has an enviable reputation
for service and technical expertise. From design through
to manufacture we concentrate on producing high quality structural and
non-structural elements, which provide best value for our clients.

Specilist Precast

CPM Environmental

  • Stormwater management
  • Wastewater management
  • Rainwater management
  • Waste management
  • Flood protection
  • Flood prevention
  • Earth tubes

Our commitment to sustainable solutions also extends to products for
storm water management, flood protection, waste management and ground
heat exchangers (Earth Tubes).

All products are manufactured using recycled material where possible.

Environmental

CPM Rail

  • Stepsafe modular platforms
  • Redi-Rock™ Modular retaining walls
  • Signal bases
  • Bridge components
  • Bomac crossing beams

CPM have responded to the increased demand for longer trains
and new stations with an innovative precast platform system.
Stepsafe consists of modular components which can be installed to
lengthen existing platforms, or construct new ones, with minimal
disruption to train services.

Rail Products

CPM Off-Site Solutions

  • Modular walls
  • Modular platforms
  • Modular tank systems
  • Bespoke precast
  • Preformed manholes and bases
  • Watertight sealed manholes

The construction industry's demand for fast, efficient, modular systems has
been met with a range of services to provide products which are designed,
engineered and manufactured off-site under factory conditions.

This results in minimal site installation costs because products are
pre-fabricated and assembled to meet construction schedules.

Off-Site Solutions
temp-thumb
temp-thumb
temp-thumb
temp-thumb
temp-thumb
temp-thumb

The CPM Group

We are a market leading manufacturer of concrete products with expansive production facilities in Somerset, Yorkshire and Scotland.

This combined with a network of specialist distributors, enables us to provide our customers with complete UK coverage. Our business is built on a solid reputation for delivering quality products and providing a first class service.

We supply a vast range of sustainable precast products to every sector of the construction industry, fully supported by our experienced technical and engineering teams.

Innovation and diversification is the key to our success.

CPM News

  • Balfour Beatty work on new busway project
  • CPM to present at Meet the Experts Seminar - 25/26 November
  • Construction CPD RoadSeminar Tour 2014 comes to London
  • Perfect Manhole cuts costs and time for Advance Construction
  • Severn Trent invests in sewer upgrade

CPM News

Balfour Beatty work on new busway project

Balfour Beatty work on new busway project

Balfour Beatty began site clearance work of the 4.5km guided busway project from Leigh to Ellenbrook in Greater Manchester during the summer of 2013. 

Whilst this was happening, the project team were developing the final designs in consultation with local residents, the local authorities and third parties such as the Environment Agency and Forestry Commission.

During 2014 Balfour Beatty removed around 175,000m³ of earth and an extensive construction programme began which included the use of CPM’s Redi-Rock™ modular retaining blocks that benefits from offering not only a pleasing aesthetic look to the project but is also fast to install and is delivered ready to use in any weather.

The 14 stop busway is due to open later this year and will reduce journey times between Leigh and central Manchester to less than 50 minutes.  The high quality buses will avoid traffic congestion along the route and offer passengers more reliable, shorter journeys which are both smoother and quieter.

Go Social, share your views

Find out more?

CPM News

CPM to present at Meet the Experts Seminar - 25/26 November

CPM to present at Meet the Experts Seminar - 25/26 November

John O'Gara from CPM will be presenting our Redi-Rock modular walling solution at a one day exhibition and CPD Networking event that offers a great opportunity for local building and construction professionals involved in specifying, buying, estimating, surveying and so on to meet industry experts and discuss some of the latest innovations.

The free to attend events are being held at the Holiday Inn Hotel, Kings Road, Harrogate HG1 1XX on the 25th November and the Ramada Salford Quays, 17 Trafford Road, Salford, M5 3AW on the 26 November.

For more information on these CPD events please visit http://www.directcontactexhibitions.com/

 

 


 

 

 

Go Social, share your views

Find out more?

CPM News

Construction CPD RoadSeminar Tour 2014 comes to London

Construction CPD RoadSeminar Tour 2014 comes to London

The next event of the Construction CPD RoadSeminar Tour 2014 is taking place at the Royal National Hotel in London on Thursday 20th November 2014.

The Construction CPD Road Seminar Tour has been running successfully over ten years to provide the platform for construction, engineering and architectural professionals to meet, learn about industry changes and developments, discuss ideas & opportunities.

Attendance at all the listed CPD seminars is free of charge and delegates are welcome to attend as many sessions as they wish. Please complete one form per person.

Details and booking information is available from Construction CPD Certification Service at 020 8840 4383; events@cpduk.co.uk; and www.cpduk.co.uk.

Go Social, share your views

Find out more?

CPM News

Perfect Manhole cuts costs and time for Advance Construction

Perfect Manhole cuts costs and time for Advance Construction

When Frazer's agreed to support the CPM Perfect Manhole system they knew it was a positive step in the installation of drainage systems as the system takes away all the hassle of installation, ensuring that the benching process - normally a highly-skilled and time-consuming job - is completed in under an hour, a far cry from the 2 - 3 days traditional manhole rings would entail.  Whereas before using ready-mixed concete to form the base, smoothing the channels and adding further concrete would required the time of a specialist labourer, the CPM Perfect Manhole provides a fully-sealed system.

Frazers presented the concept to Advance Construction, who had been sub-contracted by Walker Homes to oversee the groundworks of a site in West Lothian, Scotland.  Darren Sommer, Engineering Manager, and ALan Mulvanny, Chief Buyer at Advance Construction, were impressed with the system, and decided to use it for the Walker Homes site.

Gerry Gallacher, foreman at the site, was very impressed with the speed of the installation, which took 45 minutes for two manholes measuring 1800mm and 1200mm deep respectively.


As well as the time saved on the installation, the costs were significantly reduced due to the eliminated need for skilled labourers and safety fencing, which brings us onto the health and safety benefits the system provides: with such a quick installation period comes a much safer working environment and site measures.  The need to work in confined spaces is also reduced, providing a much more efficient work space.

Scottish Water inspectors were very positive towards the final result as the Perfect Manhole removed the risk of channels being improperly benched, which in turn means a highly reduced risk of sewage blockages in the future.

With a system designed and manufactured to last a minumum of 120 years, excellent results and a very impressed client, we look forward to working with more happy customers who opt for the Perfect Manhole!

Go Social, share your views

Find out more?

CPM News

Severn Trent invests in sewer upgrade

Severn Trent invests in sewer upgrade

CPM has supplied precast concrete caisson rings to Severn Trent Water via their contract partners, Mott McDonald Bentley to Cutnall Green in Worcestershire.

The £600,000 upgrade includes a 3km of new sewers across fields and sections of the A442, Doverdale Lane and Wassage Way and is expected to be completed by the end of the year.

In future, sewage will be pumped away rather than treated on site, which will better protect the environment and hep to prevent pollution in local rivers and streams.

Gareth Mead from Severn Trent Water said: “To make sure the quality of water in our streams and rivers get better and better, we need to continually improve and upgrade our sewers and treatment works.  Our improvements will now see Cutnall Green becoming a sewage pumping station with waste water treated at Droitwich, a larger high tech site nearby.”

Go Social, share your views

Find out more?



CPM Projects



CPM Take Off To New Heights

CPM Take Off To New Heights

“CPM have a good understanding of how partnering can achieve the best results for the contractor...”

Sally Ingall-Tombs - CPM

The Glass Works

The Glass Works

“Using Redi-Rock modular blocks reduced a programmed 5 week site schedule to a staggering 8 days”

Andrew Bache, Friel Homes

New School for Darlington

New School for Darlington

“Speed and accuracy of off-site manufacturing is essential to the early phases of site programming”

Ian Tupling, CPM Group

Bruton Flood Storage Reservoir

Bruton Flood Storage Reservoir

“CPM supplied 1869 blocks despite a tight programme and poor weather conditions on schedule”

Kevin Seymour, CPM Group

Safety System at Stratford Station

Safety System at Stratford Station

“A coating was applied to CPM precast concrete platform slabs to meet the required Network Rail specification”

Conren Truegrip

The Great Barford Bypass

The Great Barford Bypass

“Ordering precast chambers with Hydro-Brakes already fitted wins on quality and was a good reason to use CPM”

Mike Brookes Edmund Nuttall




Back to top

Concrete for life